Gordon Evans 138kV is a 203.4 MW solar interconnection project in Sedgwick, Kansas with a current status of active. It is proposed to connect at Gordon Evans 138kV.

203.4 MWCapacity
ActiveStatus
KSMarket
SolarTechnology

Project facts

Canonical nameGordon Evans 138kV
Queue IDGEN-2018-057
Statusactive
Source statusIA FULLY EXECUTED/ON SCHEDULE
MarketKS
TechnologySolar
Capacity203.4 MW
StateKansas
CountySedgwick
Point of interconnectionGordon Evans 138kV
Requested (queue) date2018-05-29
Proposed in-service date2030-05-15
Operational date
Withdrawn date
Developer
Utility / transmission ownerWERE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.