Gordon Evans 138kV Substation (GEN-2017-179)

Gordon Evans 138kV Substation is a 222.0 MW wind interconnection project in Sedgwick, Kansas with a current status of withdrawn. It is proposed to connect at Gordon Evans 138kV Substation.

222.0 MWCapacity
WithdrawnStatus
KSMarket
WindTechnology

Project facts

Canonical nameGordon Evans 138kV Substation
Queue IDGEN-2017-179
Statuswithdrawn
Source statusWITHDRAWN
MarketKS
TechnologyWind
Capacity222.0 MW
StateKansas
CountySedgwick
Point of interconnectionGordon Evans 138kV Substation
Requested (queue) date2017-11-29
Proposed in-service date2026-12-30
Operational date
Withdrawn date2023-08-07
Developer
Utility / transmission ownerWERE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.