Gordon Evans Energy Center (1240_GT1)

Gordon Evans Energy Center is a 98.3 MW gas interconnection project in Sedgwick, Kansas with a current status of operational.

98.3 MWCapacity
OperationalStatus
SWPPMarket
GasTechnology

Project facts

Canonical nameGordon Evans Energy Center
Queue ID1240_GT1
Statusoperational
Source status(OP) Operating
MarketSWPP
TechnologyGas
Capacity98.3 MW
StateKansas
CountySedgwick
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2000-06-01
Withdrawn date—
Developer—
Utility / transmission ownerEvergy

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-11

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata