GOTHAM BESS (26INR0222)

GOTHAM BESS is a 151.2 MW other interconnection project in Nueces, Texas with a current status of operational. It is proposed to connect at 5640 DRISCOLLSUB9 69kV.

151.2 MWCapacity
OperationalStatus
NuecesMarket
OtherTechnology

Project facts

Canonical nameGOTHAM BESS
Queue ID26INR0222
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketNueces
TechnologyOther
Capacity151.2 MW
StateTexas
CountyNueces
Point of interconnection5640 DRISCOLLSUB9 69kV
Requested (queue) date2023-07-31
Proposed in-service date
Operational date2027-03-17
Withdrawn date
DeveloperAEU Battery Project III LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata