GPC Primary - Sandborn Primary 161.0kV (J3294)

GPC Primary - Sandborn Primary 161.0kV is a 200.0 MW solar interconnection project in Daviess, Indiana with a current status of withdrawn. It is proposed to connect at GPC Primary - Sandborn Primary 161.0kV.

200.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameGPC Primary - Sandborn Primary 161.0kV
Queue IDJ3294
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity200.0 MW
StateIndiana
CountyDaviess
Point of interconnectionGPC Primary - Sandborn Primary 161.0kV
Requested (queue) date2024-04-17
Proposed in-service date2027-01-31
Operational date2027-01-31
Withdrawn date2025-09-16
Developer—
Utility / transmission ownerHoosier Energy

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-24phaseStudy Not StartedPhase 2low
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-11
Data last materially changed2026-10-11
Page data generated2026-10-11

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.