GPI WACO Power (70343_WAGT1)

GPI WACO Power is a 43.4 MW gas interconnection project in McLennan, Texas with a current status of active.

43.4 MWCapacity
ActiveStatus
ERCOMarket
GasTechnology

Project facts

Canonical nameGPI WACO Power
Queue ID70343_WAGT1
Statusactive
Source status(U) Under construction, less than or equal to 50 percent complete
MarketERCO
TechnologyGas
Capacity43.4 MW
StateTexas
CountyMcLennan
Point of interconnection—
Requested (queue) date—
Proposed in-service date2027-01-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerGraphic Packaging International

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-02new_project—activehigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata