Graceton 230kV (X3-068)

Graceton 230kV is a 678.0 MW gas interconnection project in York, Pennsylvania with a current status of withdrawn.

678.0 MWCapacity
WithdrawnStatus
—Market
GasTechnology

Project facts

Canonical nameGraceton 230kV
Queue IDX3-068
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyGas
Capacity678.0 MW
StatePennsylvania
CountyYork
Point of interconnection—
Requested (queue) date2011-10-14
Proposed in-service date2017-06-01
Operational date—
Withdrawn date2014-06-04
Developer—
Utility / transmission ownerBGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.