Graceton-Nottingham 230kV (N01)

Graceton-Nottingham 230kV is a 550.0 MW gas interconnection project in York, Pennsylvania with a current status of withdrawn.

550.0 MWCapacity
WithdrawnStatus
—Market
GasTechnology

Project facts

Canonical nameGraceton-Nottingham 230kV
Queue IDN01
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyGas
Capacity550.0 MW
StatePennsylvania
CountyYork
Point of interconnection—
Requested (queue) date2004-08-02
Proposed in-service date2008-06-01
Operational date—
Withdrawn date2005-08-30
Developer—
Utility / transmission ownerPECO

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-11
Data last materially changed2026-10-11
Page data generated2026-10-11

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.