Grand Marsh Solar (AF2-350)

Grand Marsh Solar is a 100.0 MW solar interconnection project in Kankakee, Illinois with a current status of active. It is proposed to connect at Kensington 138 kV.

100.0 MWCapacity
ActiveStatus
PJMMarket
SolarTechnology

Project facts

Canonical nameGrand Marsh Solar
Queue IDAF2-350
Statusactive
Source statusactive
MarketPJM
TechnologySolar
Capacity100.0 MW
StateIllinois
CountyKankakee
Point of interconnectionKensington 138 kV
Requested (queue) date2020-03-31
Proposed in-service date2023-12-01
Operational date
Withdrawn date
DeveloperDeriva Energy
Utility / transmission ownerComEd

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.