Grand Prairie-Grand Island (Holt County NE) 345kV (GEN-2017-165)

Grand Prairie-Grand Island (Holt County NE) 345kV is a 288.0 MW wind interconnection project in Holt, Nebraska with a current status of withdrawn. It is proposed to connect at Grand Prairie-Grand Island (Holt County NE) 345kV.

288.0 MWCapacity
WithdrawnStatus
NEMarket
WindTechnology

Project facts

Canonical nameGrand Prairie-Grand Island (Holt County NE) 345kV
Queue IDGEN-2017-165
Statuswithdrawn
Source statusWITHDRAWN
MarketNE
TechnologyWind
Capacity288.0 MW
StateNebraska
CountyHolt
Point of interconnectionGrand Prairie-Grand Island (Holt County NE) 345kV
Requested (queue) date2017-11-29
Proposed in-service date
Operational date
Withdrawn date2019-03-22
Developer
Utility / transmission ownerSPP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata