Grandhaven Substation is a 10.2 MW other interconnection project in Yamhill, Oregon with a current status of withdrawn. It is proposed to connect at Walnut City 115kV Tap between structures 2/3 & 2/4.

10.2 MWCapacity
WithdrawnStatus
ORMarket
OtherTechnology

Project facts

Canonical nameGrandhaven Substation
Queue IDL0391
Statuswithdrawn
Source statusWITHDRAWN
MarketOR
TechnologyOther
Capacity10.2 MW
StateOregon
CountyYamhill
Point of interconnectionWalnut City 115kV Tap between structures 2/3 & 2/4
Requested (queue) date2015-10-08
Proposed in-service date2019-10-01
Operational date
Withdrawn date
DeveloperThe City of McMinnville, a municipal corporation of the State of Oregon, acting by and through its Water and Light Commission
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata