Grandview Phase I (Conway Windfarm) is a 211.0 MW wind interconnection project with a current status of operational. It is proposed to connect at Alibates (79500).

211.0 MWCapacity
OperationalStatus
ERCOTMarket
WindTechnology

Project facts

Canonical nameGrandview Phase I (Conway Windfarm)
Queue ID13INR0005a
Statusoperational
Source statusoperational
MarketERCOT
TechnologyWind
Capacity211.0 MW
State
County
Point of interconnectionAlibates (79500)
Requested (queue) date2009-03-26
Proposed in-service date2014-12-01
Operational date2014-12-12
Withdrawn date
DeveloperEon
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata