Granite Mountain Wind Power (Duke Energy Generation Services) (34)
Granite Mountain Wind Power (Duke Energy Generation Services) is a 101.2 MW wind interconnection project in Hudspeth, Texas with a current status of withdrawn. It is proposed to connect at Coyote-RGDC 115 kV line @ point of EPE ownership.
101.2 MWCapacity
WithdrawnStatus
WestMarket
WindTechnology
Project facts
| Canonical name | Granite Mountain Wind Power (Duke Energy Generation Services) |
|---|---|
| Queue ID | 34 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | West |
| Technology | Wind |
| Capacity | 101.2 MW |
| State | Texas |
| County | Hudspeth |
| Point of interconnection | Coyote-RGDC 115 kV line @ point of EPE ownership |
| Requested (queue) date | 2010-08-20 |
| Proposed in-service date | 2012-12-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | El Paso Electric Company |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata