Grant Co. - E. Fergus Falls - Hoot Lake 115 kV Line Tap (J1038)

Grant Co. - E. Fergus Falls - Hoot Lake 115 kV Line Tap is a 32.5 MW solar interconnection project in Grant County, Minnesota with a current status of withdrawn. It is proposed to connect at Grant Co. - E. Fergus Falls - Hoot Lake 115 kV Line Tap.

32.5 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameGrant Co. - E. Fergus Falls - Hoot Lake 115 kV Line Tap
Queue IDJ1038
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity32.5 MW
StateMinnesota
CountyGrant County
Point of interconnectionGrant Co. - E. Fergus Falls - Hoot Lake 115 kV Line Tap
Requested (queue) date2018-03-12
Proposed in-service date2020-09-01
Operational date2020-09-01
Withdrawn date2020-03-25
Developer
Utility / transmission ownerOtter Tail Power Company

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata