Grapefruit Solar (27INR0118)
Grapefruit Solar is a 291.4 MW solar interconnection project in Hidalgo, Texas with a current status of suspended.
291.4 MWCapacity
SuspendedStatus
HidalgoMarket
SolarTechnology
Project facts
| Canonical name | Grapefruit Solar |
|---|---|
| Queue ID | 27INR0118 |
| Status | suspended |
| Source status | — |
| Market | Hidalgo |
| Technology | Solar |
| Capacity | 291.4 MW |
| State | Texas |
| County | Hidalgo |
| Point of interconnection | — |
| Requested (queue) date | — |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | ERCOT |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-10-30 | developer | Grapefruit Solar LLC | — | low |
| 2026-10-30 | poi_name | North Edinburg (Bus #8905) - Reforzar (Bus # 80078) 345kV | — | low |
| 2026-10-30 | phase | SS Completed, FIS Completed, IA | — | low |
| 2026-10-30 | ia_signed_date | 2025-04-10 | — | medium |
| 2026-10-30 | operational_date | 2028-12-31 | — | medium |
| 2026-10-30 | status | operational | suspended | high |
| 2026-09-30 | phase | SS Completed, FIS Started, IA | SS Completed, FIS Completed, IA | low |
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-10-30
Data last materially changed2026-10-30
Page data generated2026-11-26
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.