Gravel Pit Solar increase (940)

Gravel Pit Solar increase is a 25.0 MW solar interconnection project in Hartford, Connecticut with a current status of operational. It is proposed to connect at Line cut and three-breaker ring bus of the 115 kV Connecticut Light & Power Company line between Barbour Hill and Windsor Locks..

25.0 MWCapacity
OperationalStatus
CTMarket
SolarTechnology

Project facts

Canonical nameGravel Pit Solar increase
Queue ID940
Statusoperational
Source statusC
MarketCT
TechnologySolar
Capacity25.0 MW
StateConnecticut
CountyHartford
Point of interconnectionLine cut and three-breaker ring bus of the 115 kV Connecticut Light & Power Company line between Barbour Hill and Windsor Locks.
Requested (queue) date2019-12-04
Proposed in-service date
Operational date2025-08-13
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.