Gravitas I Solar (30INR0083)
Gravitas I Solar is a 1,124.8 MW solar interconnection project in Pecos, Texas with a current status of operational. It is proposed to connect at Tap 345kV Solstice (60404) - Bakersfield (76002) Double circuit line .
1,124.8 MWCapacity
OperationalStatus
PecosMarket
SolarTechnology
Project facts
| Canonical name | Gravitas I Solar |
|---|---|
| Queue ID | 30INR0083 |
| Status | operational |
| Source status | SS Completed, FIS Started, No IA |
| Market | Pecos |
| Technology | Solar |
| Capacity | 1,124.8 MW |
| State | Texas |
| County | Pecos |
| Point of interconnection | Tap 345kV Solstice (60404) - Bakersfield (76002) Double circuit line |
| Requested (queue) date | 2026-03-24 |
| Proposed in-service date | — |
| Operational date | 2030-06-30 |
| Withdrawn date | — |
| Developer | S&R SOLAR DESIGN CORP |
| Utility / transmission owner | ERCOT |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata