Grazing Yak Solar (62376_PV1)

Grazing Yak Solar is a 35.0 MW solar interconnection project in El Paso, Colorado with a current status of operational.

35.0 MWCapacity
OperationalStatus
WACMMarket
SolarTechnology

Project facts

Canonical nameGrazing Yak Solar
Queue ID62376_PV1
Statusoperational
Source status(OP) Operating
MarketWACM
TechnologySolar
Capacity35.0 MW
StateColorado
CountyEl Paso
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2019-11-01
Withdrawn date
Developer
Utility / transmission ownerGrazing Yak Solar, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata