Greasewood II LLC (67006_TBSP)

Greasewood II LLC is a 306.0 MW solar interconnection project in Pecos, Texas with a current status of operational.

306.0 MWCapacity
OperationalStatus
ERCOMarket
SolarTechnology

Project facts

Canonical nameGreasewood II LLC
Queue ID67006_TBSP
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologySolar
Capacity306.0 MW
StateTexas
CountyPecos
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2024-10-01
Withdrawn date—
Developer—
Utility / transmission ownerGreasewood II LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-11

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata