Great Hambino BESS (26INR0654)

Great Hambino BESS is a 123.0 MW other interconnection project in Atascosa, Texas with a current status of operational. It is proposed to connect at #5700 Miracle Lake Substation 138kV .

123.0 MWCapacity
OperationalStatus
AtascosaMarket
OtherTechnology

Project facts

Canonical nameGreat Hambino BESS
Queue ID26INR0654
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketAtascosa
TechnologyOther
Capacity123.0 MW
StateTexas
CountyAtascosa
Point of interconnection#5700 Miracle Lake Substation 138kV
Requested (queue) date2025-09-11
Proposed in-service date
Operational date2027-10-01
Withdrawn date
DeveloperAtascosa BESS, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata