GREEN BORDERS GEOTHERMAL PHASE 2 (185)

GREEN BORDERS GEOTHERMAL PHASE 2 is a 150.0 MW gas interconnection project in Mineral, Nevada with a current status of withdrawn. It is proposed to connect at Control Sub.

150.0 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nameGREEN BORDERS GEOTHERMAL PHASE 2
Queue ID185
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyGas
Capacity150.0 MW
StateNevada
CountyMineral
Point of interconnectionControl Sub
Requested (queue) date2007-03-06
Proposed in-service date
Operational date
Withdrawn date2011-01-03
Developer
Utility / transmission ownerSCE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.