GREEN BORDERS GEOTHERMAL PHASE II (148)

GREEN BORDERS GEOTHERMAL PHASE II is a 90.0 MW gas interconnection project in Church, Nevada with a current status of withdrawn. It is proposed to connect at Oxbow 230kV Substation.

90.0 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nameGREEN BORDERS GEOTHERMAL PHASE II
Queue ID148
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyGas
Capacity90.0 MW
StateNevada
CountyChurch
Point of interconnectionOxbow 230kV Substation
Requested (queue) date2006-11-16
Proposed in-service date
Operational date
Withdrawn date2007-02-01
Developer
Utility / transmission ownerSCE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.