Green Forest South - Harrison West 161kV (J899)

Green Forest South - Harrison West 161kV is a 180.0 MW wind interconnection project in Carroll County, Arkansas with a current status of withdrawn. It is proposed to connect at Green Forest South - Harrison West 161kV.

180.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameGreen Forest South - Harrison West 161kV
Queue IDJ899
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity180.0 MW
StateArkansas
CountyCarroll County
Point of interconnectionGreen Forest South - Harrison West 161kV
Requested (queue) date2017-06-16
Proposed in-service date2019-10-15
Operational date2019-10-15
Withdrawn date2019-03-25
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata