Green Power 2 (55470_ST805)
Green Power 2 is a 250.0 MW gas interconnection project in Galveston, Texas with a current status of suspended.
250.0 MWCapacity
SuspendedStatus
ERCOMarket
GasTechnology
Project facts
| Canonical name | Green Power 2 |
|---|---|
| Queue ID | 55470_ST805 |
| Status | suspended |
| Source status | (OS) Out of service and NOT expected to return to service in next calendar year |
| Market | ERCO |
| Technology | Gas |
| Capacity | 250.0 MW |
| State | Texas |
| County | Galveston |
| Point of interconnection | — |
| Requested (queue) date | — |
| Proposed in-service date | — |
| Operational date | 2009-05-01 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | South Houston Green Power LLC |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-02 | new_project | — | suspended | high |
Explore related data
Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata