Green Ridges Energy Center (25-IC-AP)

Green Ridges Energy Center is a 140.0 MW battery interconnection project in Floyd County, Georgia with a current status of operational.

140.0 MWCapacity
OperationalStatus
GAMarket
BatteryTechnology

Project facts

Canonical nameGreen Ridges Energy Center
Queue ID25-IC-AP
Statusoperational
Source status
MarketGA
TechnologyBattery
Capacity140.0 MW
StateGeorgia
CountyFloyd County
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata