Greenidge Unit #4 (0431)
Greenidge Unit #4 is a 106.3 MW gas interconnection project in Yates, New York with a current status of operational. It is proposed to connect at Greenidge Substation 115kV.
106.3 MWCapacity
OperationalStatus
CMarket
GasTechnology
Project facts
| Canonical name | Greenidge Unit #4 |
|---|---|
| Queue ID | 0431 |
| Status | operational |
| Source status | 14 |
| Market | C |
| Technology | Gas |
| Capacity | 106.3 MW |
| State | New York |
| County | Yates |
| Point of interconnection | Greenidge Substation 115kV |
| Requested (queue) date | 2014-04-11 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | Greenidge Generation |
| Utility / transmission owner | NYSEG |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata