Greenland Gap III (AH1-255 - moved to TC2)

Greenland Gap III is a 240.0 MW battery interconnection project in Grant, West Virginia with a current status of withdrawn.

240.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameGreenland Gap III
Queue IDAH1-255 - moved to TC2
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity240.0 MW
StateWest Virginia
CountyGrant
Point of interconnection
Requested (queue) date2021-09-09
Proposed in-service date2025-07-31
Operational date
Withdrawn date2025-07-07
Developer
Utility / transmission ownerAPS

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata