Greenridge Landfill (V4-014)

Greenridge Landfill is a 6.5 MW gas interconnection project in Westmoreland, Pennsylvania with a current status of withdrawn.

6.5 MWCapacity
WithdrawnStatus
—Market
GasTechnology

Project facts

Canonical nameGreenridge Landfill
Queue IDV4-014
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyGas
Capacity6.5 MW
StatePennsylvania
CountyWestmoreland
Point of interconnection—
Requested (queue) date2009-11-20
Proposed in-service date2010-12-31
Operational date—
Withdrawn date2010-11-12
Developer—
Utility / transmission ownerAPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.