Greensburg 115 kV Substation (GEN-2021-022)

Greensburg 115 kV Substation is a 75.0 MW wind interconnection project in Kiowa, Kansas with a current status of withdrawn. It is proposed to connect at Greensburg 115 kV Substation.

75.0 MWCapacity
WithdrawnStatus
KSMarket
WindTechnology

Project facts

Canonical nameGreensburg 115 kV Substation
Queue IDGEN-2021-022
Statuswithdrawn
Source statusWITHDRAWN
MarketKS
TechnologyWind
Capacity75.0 MW
StateKansas
CountyKiowa
Point of interconnectionGreensburg 115 kV Substation
Requested (queue) date2021-04-20
Proposed in-service date2026-12-31
Operational date
Withdrawn date2023-07-17
Developer
Utility / transmission ownerSUNC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata