Kiowa County, Kansas — Interconnection Projects
The interXdata warehouse tracks 6 interconnection projects in Kiowa, Kansas, representing 592 MW of requested capacity.
6Total projects
0Active
3Operational
3Withdrawn
592 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Wind | 5 | 592 MW |
| Solar | 1 | 1 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Clark County - Thistle 345 kV line break | GEN-2022-194 | Wind | 200.0 MW | withdrawn | Kiowa, Kansas |
| Clark County - Thistle 345 kV line break | GEN-2022-190 | Wind | 200.0 MW | withdrawn | Kiowa, Kansas |
| Shooting Star | 58018_1 | Wind | 104.0 MW | operational | Kiowa, Kansas |
| Greensburg 115 kV Substation | GEN-2021-022 | Wind | 75.0 MW | withdrawn | Kiowa, Kansas |
| Greensburg | 57118_GEN 1 | Wind | 12.5 MW | operational | Kiowa, Kansas |
| Greensburg Solar | 68694_GRNBG | Solar | 1.0 MW | operational | Kiowa, Kansas |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Kiowa County.
Start tracking with interXdata