Greyhound Solar (21INR0268)

Greyhound Solar is a 335.4 MW solar interconnection project in Ector, Texas with a current status of operational. It is proposed to connect at Tap 345kV 11010 Wolf - 1018 Moss.

335.4 MWCapacity
OperationalStatus
EctorMarket
SolarTechnology

Project facts

Canonical nameGreyhound Solar
Queue ID21INR0268
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketEctor
TechnologySolar
Capacity335.4 MW
StateTexas
CountyEctor
Point of interconnectionTap 345kV 11010 Wolf - 1018 Moss
Requested (queue) date2019-03-28
Proposed in-service date
Operational date2026-06-30
Withdrawn date
DeveloperRockhound Solar 2, LLC dba "Greyhound Solar"
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.