GRID LNS (1318)
GRID LNS is a 9.0 MW generation interconnection project in Middlesex/Worcester, Massachusetts with a current status of withdrawn. It is proposed to connect at GRID 69 kV transmission lines U-21S and U-21E.
9.0 MWCapacity
WithdrawnStatus
CMAMarket
GenerationTechnology
Project facts
| Canonical name | GRID LNS |
|---|---|
| Queue ID | 1318 |
| Status | withdrawn |
| Source status | W |
| Market | CMA |
| Technology | Generation |
| Capacity | 9.0 MW |
| State | Massachusetts |
| County | Middlesex/Worcester |
| Point of interconnection | GRID 69 kV transmission lines U-21S and U-21E |
| Requested (queue) date | 2022-10-03 |
| Proposed in-service date | 2023-10-03 |
| Operational date | — |
| Withdrawn date | 2023-07-03 |
| Developer | — |
| Utility / transmission owner | ISO-NE |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata