Grimes County Solar (67046_GS1)

Grimes County Solar is a 210.0 MW solar interconnection project in Grimes, Texas with a current status of operational.

210.0 MWCapacity
OperationalStatus
ERCOMarket
SolarTechnology

Project facts

Canonical nameGrimes County Solar
Queue ID67046_GS1
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologySolar
Capacity210.0 MW
StateTexas
CountyGrimes
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2026-01-01
Withdrawn date—
Developer—
Utility / transmission ownerGrimes County Solar Project, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-11-01
Data last materially changed2026-11-01
Page data generated2026-11-26

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata