GRIMES SOLAR (26INR0004)

GRIMES SOLAR is a 153.4 MW solar interconnection project in Grimes, Texas with a current status of operational. It is proposed to connect at 40600 Roans Prairie 345kV .

153.4 MWCapacity
OperationalStatus
GrimesMarket
SolarTechnology

Project facts

Canonical nameGRIMES SOLAR
Queue ID26INR0004
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketGrimes
TechnologySolar
Capacity153.4 MW
StateTexas
CountyGrimes
Point of interconnection40600 Roans Prairie 345kV
Requested (queue) date2022-03-14
Proposed in-service date
Operational date2026-02-15
Withdrawn date
DeveloperCG Grimes County LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata