Groton 345 kV substation (GEN-2019-060)

Groton 345 kV substation is a 150.0 MW wind interconnection project in Day, South Dakota with a current status of withdrawn. It is proposed to connect at Groton 345 kV substation.

150.0 MWCapacity
WithdrawnStatus
SDMarket
WindTechnology

Project facts

Canonical nameGroton 345 kV substation
Queue IDGEN-2019-060
Statuswithdrawn
Source statusWITHDRAWN
MarketSD
TechnologyWind
Capacity150.0 MW
StateSouth Dakota
CountyDay
Point of interconnectionGroton 345 kV substation
Requested (queue) date2019-05-22
Proposed in-service date2025-12-31
Operational date
Withdrawn date2022-12-01
Developer
Utility / transmission ownerBEPC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata