Grover-East Towanda 230 kV (T100)

Grover-East Towanda 230 kV is a 200.0 MW wind interconnection project in Bradford, Pennsylvania with a current status of withdrawn.

200.0 MWCapacity
WithdrawnStatus
—Market
WindTechnology

Project facts

Canonical nameGrover-East Towanda 230 kV
Queue IDT100
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyWind
Capacity200.0 MW
StatePennsylvania
CountyBradford
Point of interconnection—
Requested (queue) date2007-11-12
Proposed in-service date2009-09-30
Operational date—
Withdrawn date2008-10-15
Developer—
Utility / transmission ownerPENELEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-11
Data last materially changed2026-10-11
Page data generated2026-10-11

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata