GRS CMS (55599_1)

GRS CMS is a 5.3 MW gas interconnection project in Cabarrus, North Carolina with a current status of operational.

5.3 MWCapacity
OperationalStatus
DUKMarket
GasTechnology

Project facts

Canonical nameGRS CMS
Queue ID55599_1
Statusoperational
Source status(OP) Operating
MarketDUK
TechnologyGas
Capacity5.3 MW
StateNorth Carolina
CountyCabarrus
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date1999-12-01
Withdrawn date
Developer
Utility / transmission ownerGas Recovery Systems Inc

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata