Gulf Livingston - SHECO Menard (J867)

Gulf Livingston - SHECO Menard is a 200.0 MW solar interconnection project in Polk County, Texas with a current status of withdrawn. It is proposed to connect at Gulf Livingston - SHECO Menard.

200.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameGulf Livingston - SHECO Menard
Queue IDJ867
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity200.0 MW
StateTexas
CountyPolk County
Point of interconnectionGulf Livingston - SHECO Menard
Requested (queue) date2017-06-16
Proposed in-service date2019-09-29
Operational date2019-09-29
Withdrawn date2019-01-07
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.