Gusty Windpower is a 248.9 MW other interconnection project in Glasscock, Texas with a current status of operational. It is proposed to connect at Tap 345kV 59903 Bearkat - 1058 Longshore_5; Anemone 345 kV Station .

248.9 MWCapacity
OperationalStatus
GlasscockMarket
OtherTechnology

Project facts

Canonical nameGusty Windpower
Queue ID29INR0040
Statusoperational
Source statusSS Completed, FIS Started, IA
MarketGlasscock
TechnologyOther
Capacity248.9 MW
StateTexas
CountyGlasscock
Point of interconnectionTap 345kV 59903 Bearkat - 1058 Longshore_5; Anemone 345 kV Station
Requested (queue) date2024-07-30
Proposed in-service date
Operational date2028-12-31
Withdrawn date
DeveloperGusty Windpower, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata