GV1 (208)

GV1 is a 2.0 MW solar interconnection project in Alameda, California with a current status of withdrawn. It is proposed to connect at Tracy-Herdlyn 69kV line.

2.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameGV1
Queue ID208
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologySolar
Capacity2.0 MW
StateCalifornia
CountyAlameda
Point of interconnectionTracy-Herdlyn 69kV line
Requested (queue) date2007-05-03
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata