GYPSY ESS 2 is a 300.0 MW battery interconnection project in San Diego, California with a current status of withdrawn. It is proposed to connect at Bay Boulevard 230kV.

300.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameGYPSY ESS 2
Queue ID1813
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyBattery
Capacity300.0 MW
StateCalifornia
CountySan Diego
Point of interconnectionBay Boulevard 230kV
Requested (queue) date2020-04-15
Proposed in-service date
Operational date
Withdrawn date2020-07-06
Developer
Utility / transmission ownerSDGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.