Hackett - N Huntington 161 kV Line Tap is a 150.0 MW solar interconnection project in Sebastian, Arkansas with a current status of withdrawn. It is proposed to connect at Hackett - N Huntington 161 kV Line Tap.

150.0 MWCapacity
WithdrawnStatus
ARMarket
SolarTechnology

Project facts

Canonical nameHackett - N Huntington 161 kV Line Tap
Queue IDGEN-2023-180
Statuswithdrawn
Source statusWITHDRAWN
MarketAR
TechnologySolar
Capacity150.0 MW
StateArkansas
CountySebastian
Point of interconnectionHackett - N Huntington 161 kV Line Tap
Requested (queue) date2023-10-02
Proposed in-service date2028-06-01
Operational date
Withdrawn date2025-08-25
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata