Haefling (1358_2)

Haefling is a 20.7 MW gas interconnection project in Fayette, Kentucky with a current status of operational.

20.7 MWCapacity
OperationalStatus
LGEEMarket
GasTechnology

Project facts

Canonical nameHaefling
Queue ID1358_2
Statusoperational
Source status(OP) Operating
MarketLGEE
TechnologyGas
Capacity20.7 MW
StateKentucky
CountyFayette
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date1970-10-01
Withdrawn date
Developer
Utility / transmission ownerKentucky Utilities Co

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata