Halfway-N=Milnor 34.5kV (AB2-003)

Halfway-N=Milnor 34.5kV is a 4.4 MW solar interconnection project in Washington, Maryland with a current status of withdrawn.

4.4 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameHalfway-N=Milnor 34.5kV
Queue IDAB2-003
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity4.4 MW
StateMaryland
CountyWashington
Point of interconnection
Requested (queue) date2015-11-09
Proposed in-service date2017-12-31
Operational date
Withdrawn date2016-12-19
Developer
Utility / transmission ownerAPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-28

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.