Hamilton Sundstrand (250)

Hamilton Sundstrand is a 5.0 MW gas interconnection project in Hartford, Connecticut with a current status of operational. It is proposed to connect at CL&P Windsor Locks Substation.

5.0 MWCapacity
OperationalStatus
CTMarket
GasTechnology

Project facts

Canonical nameHamilton Sundstrand
Queue ID250
Statusoperational
Source statusC
MarketCT
TechnologyGas
Capacity5.0 MW
StateConnecticut
CountyHartford
Point of interconnectionCL&P Windsor Locks Substation
Requested (queue) date2008-02-13
Proposed in-service date
Operational date2011-10-01
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.