Hampshire - Ridgeley 138 kV 2 (AH1-459)

Hampshire - Ridgeley 138 kV 2 is a 50.0 MW battery interconnection project in Hampshire, West Virginia with a current status of withdrawn.

50.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameHampshire - Ridgeley 138 kV 2
Queue IDAH1-459
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity50.0 MW
StateWest Virginia
CountyHampshire
Point of interconnection
Requested (queue) date2021-09-11
Proposed in-service date2024-09-30
Operational date
Withdrawn date2024-12-18
Developer
Utility / transmission ownerAPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-28

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata