Handley (3491_4)

Handley is a 455.0 MW gas interconnection project in Tarrant, Texas with a current status of operational.

455.0 MWCapacity
OperationalStatus
ERCOMarket
GasTechnology

Project facts

Canonical nameHandley
Queue ID3491_4
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologyGas
Capacity455.0 MW
StateTexas
CountyTarrant
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date1976-10-01
Withdrawn date—
Developer—
Utility / transmission ownerConstellation Power, Inc

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-11

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata