Hansford 115kV (GEN-2025-SR2)

Hansford 115kV is a 67.2 MW wind interconnection project in Hansford County, Texas with a current status of withdrawn. It is proposed to connect at Hansford 115kV.

67.2 MWCapacity
WithdrawnStatus
TXMarket
WindTechnology

Project facts

Canonical nameHansford 115kV
Queue IDGEN-2025-SR2
Statuswithdrawn
Source statusWITHDRAWN
MarketTX
TechnologyWind
Capacity67.2 MW
StateTexas
CountyHansford County
Point of interconnectionHansford 115kV
Requested (queue) date2025-05-05
Proposed in-service date2028-01-31
Operational date—
Withdrawn date2026-10-30
Developer—
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-11-17withdrawn_date—2026-10-30high
2026-11-17statusactivewithdrawnhigh
2026-07-31new_project—activehigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata