Hanson Solar (23INR0086)
Hanson Solar is a 398.8 MW solar interconnection project in Coleman, Texas with a current status of operational. It is proposed to connect at tap 345kV 1444 Brown - 11406 Central Bluff.
398.8 MWCapacity
OperationalStatus
ColemanMarket
SolarTechnology
Project facts
| Canonical name | Hanson Solar |
|---|---|
| Queue ID | 23INR0086 |
| Status | operational |
| Source status | SS Completed, FIS Completed, IA |
| Market | Coleman |
| Technology | Solar |
| Capacity | 398.8 MW |
| State | Texas |
| County | Coleman |
| Point of interconnection | tap 345kV 1444 Brown - 11406 Central Bluff |
| Requested (queue) date | 2020-10-23 |
| Proposed in-service date | — |
| Operational date | 2027-04-17 |
| Withdrawn date | — |
| Developer | Hanson Solar, LLC |
| Utility / transmission owner | ERCOT |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.