Hardeson Battery Storage Expansion (G0500)

Hardeson Battery Storage Expansion is a 1.0 MW battery interconnection project in Snohomish, Washington with a current status of operational. It is proposed to connect at Hardeson Substation.

1.0 MWCapacity
OperationalStatus
WAMarket
BatteryTechnology

Project facts

Canonical nameHardeson Battery Storage Expansion
Queue IDG0500
Statusoperational
Source statusENERGIZED
MarketWA
TechnologyBattery
Capacity1.0 MW
StateWashington
CountySnohomish
Point of interconnectionHardeson Substation
Requested (queue) date2014-10-02
Proposed in-service date
Operational date2015-07-01
Withdrawn date
DeveloperPublic Utility District No. 1 of Cowlitz County
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata